Skip to content
EcoRanga Group

Ecoranga Group

  • Home
  • About Us
  • Services
    • Designing works
    • Preparation of a feasibility study
    • Fund raising for the construction of the object
    • Project administration services
  • Products
    • Wastewater treatment equipment
    • Water treatment equipment
    • Waste sorting equipment
  • Experience
  • Downloads
  • Contacts
  • English
    • Lietuvių Lietuvių
    • English English
    • Русский Русский
Nuotekų valymo įrenginiai

Leaders in Technological Projects Development

We implement innovative, reliable, efficient and economically attractive solutions.
Contact Us

Our Products

We are a team of professional designers, engineers, technologists. We have accumulated 10 years of experience, so we can offer quality, innovative, time-tested and reliable solutions.

Wastewater treatment equipment

Wastewater treatment plants are adapted for cities of various sizes, factories, landfills and many other spheres.

Water treatment equipment

Our offered equipment for water treatment is designed for any degree of water pollution.

Waste sorting equipment

We offer both waste sorting facilities as well as waste incinerators for all kinds of waste management.

Our Services

We are a zealous, ambitious, reliable team offering design, financing, project management services. We have accumulated considerable experience in this field, so we can offer quality, time-tested and reliable solutions.

Project administration services

Ecoranga group has many years of experience in the field of project administration.

Fund raising for the construction of the object

Usually, due to lack of information, the client does not contact all financial institutions and does not submit applications in order to receive the funds.

Preparation of a feasibility study

The first step before starting the development of an object is the preparation of a feasibility study.

Designing works

Ecoranga group has many years of experience in the field of designing.

Gallery

Take a look at the projects ECORANGA GROUP has already implemented in the fields of designing, constructing and launching of wastewater treatment plants. If you are interested in our services - contact us.

JSC “Koroza” meat factory, Bulgari

Average daily flow (m3/d) 240

JSC “R&Q” chemical industry factory, France

Average daily flow (m3/d) 400

JSC “Lactalis Vitre” milk factory, France

Average daily flow (m3/d) 800

JSC “Alvest” PET recycling, Czech Republic

Average daily flow (m3/d) 160

JSC “Agrovet” meat factory, Lithuania

Average daily flow (m3/d) 160

JSC “Vilke” meat factory, Lithuania

Average daily flow (m3/d) 280

Our goal is to implement all your Design and Technological projects

IMPLEMENTED PROJECTS
217

IMPLEMENTED PROJECTS

HAPPY CLIENTS
359

HAPPY CLIENTS

INNOVATIVITY OF TECHNOLOGY
95%

INNOVATIVITY OF TECHNOLOGY

Testimonials

Our Partners

About us

The goal of Ecoranga group is to become the leaders of the development of engineering, technological projects that would implement innovative, reliable, effective and economical technological decisions. This way, we are able to contribute to nature conservation and the preservation of balance. In order to reach our goals, we use reliable technological solutions. The main goal of our group is to properly carry out works and satisfy the needs of our clients.

Quick Links

  • About Us
  • Products
  • Services
  • Contacts
  • Downloads

Contact Us

JSC “Ecoranga Group”
Phone: +370 676 88888
Email: ecoranga@ecoranga.com

Address: Ežero str. 24A, Antežeriai,
Zujūnų eldership, Vilniaus district,
Lithuania, LT-14158

ECORANGA GROUP © 2018 | by: Leader Websites
Your privacy is important to us which is why we want to inform you that our website uses cookies to improve your experience. We collect certain personal data to provide you with the products or services you request.Read moreAgree & Close